Are you ready for a Beatrixalong?

Beatrixalong

Beatrixalong

The Beatrix Sewalong is now underway!
If this is your first time landing here, it’s not too late to join in. We’re taking a full eight days to sew Beatrix, and I’ll put links to each new post here as we move through the week. For this sewalong, I’m making a short-sleeved View A as shown in the image above. This is the simplest version of the pattern (View B has more pieces) so it’s a great place to start if you’re new to garment sewing, and the short sleeve is perfect for summer!

Here’s the Beatrixalong schedule:I’ve mapped this out so you can work slowly, taking about 30-60 minutes each day.
Preparation – Gather your materials
Day 1: Friday, July 10 – Measure and Print
Day 2: Saturday, July 11 – Trace pattern and Make a muslin
Day 3: Sunday, July 12 – Cut and prep
Day 4: Monday, July 13 – Sew darts, shoulders seams, and side seams
Day 5: Tuesday, July 14 – Sleeves
Day 6: Wednesday, July 15 – Prep and attach facings
Day 7: Thursday, July 16 – Hemming and button placket finishing
Day 8: Friday, July 17– Buttonholes and buttons

Other links:
Bust Adjustment: How to shorten or lengthen a dart
Beatrixalong Roundup
The official Beatrixalong pageHow to make a Beatrix View A with the View B button placket